hello dummmy text

Mining Success

Our Management Personnel have been part of the reopening of a large open pit mining operation in California’s Mojave Desert. As the Site Operations Managers, our experts led a team of 20 Control Systems Engineers and Technicians. To construct a vast Intellution iFix Redundant SCADA and Allen Bradley Logix 5000 Platform PLC network across 18 Buildings. Within these buildings there were proprietary process control solutions. We worked directly with the site Process Engineers and Geologists. We build a system that extracted Rare Earth Minerals, milled, processed and packaged
them for sale. In addition, designed all of the
site PLC and SCADA protocols. Our team ensured
that all employees adhered to these strict
standards..

Pharamceutical Success

Our staff have also worked with many major pharmaceutical manufacturers throughout their careers. Parts of the success have been in the adherence to CFR Part 11. With respect to climate control and monitoring within clean spaces. We sucessfully designed, engineered, built and installed many multi-workstation Iconics SCADA control systems. In addition, managing a team of engineers maintaining strict adherence to the requirements set forth in the scope defined by the client and CFR Part 11.

WhatsApp Image 2021-12-20 at 8.13.21 PM

Other Notable Success Areas

  • Amusement Parks and Rides.
  • Power Generation.
  • Food and Beverage Manufacturing.
  • Central Campus Heating and Cooling Systems.
  • Garment Distribution Centers.
  • Material Handling Solutions.
  • Wastewater and Sewage Processing.
  • Emergency High-Rise Building Cooling.
  • Municipal Water Delivery Systems